中文  |  EN
2018 In 2018, the Engineering Consulting Office cooperated with China Petroleum and Chemical Industry Federation (CPCIF) to complete the compilation of the Construction Standards for the Parking Lots for Dangerous Goods Transport Vehicles in Chemical Industry Parks and the Construction Standards for Emergency Facilities (Pools) in Chemical Industry Parks.
2007 In 2007, the 300,000-ton Import Crude Oil Terminal of Dalian designed by the Port & Waterway Division won the Second Prize of the Award for S&T Progress in Port in China.
2005 In 2005, the Port & Waterway Division developed a new-type high-piled wharf structure. It is an easy and convenient new-type high-piled wharf structure that can significantly improve the durability of high-piled wharfs with little difference between the construction costs of this new-type high-piled wharf structure and that of the existing and conventional beam-slab high-piled wharf structure. This technique has obtained the national patent (patent number: 200610200456).
2004 In 2004, the Bridge and Tunnel Division won the Second Prize of 2004 Huaxia Architectural Science and Technology Award for the design technique study of ‘Large Concrete Cable-stayed Bridge and T-type Rigid-frame cooperative-system Bridge’ adopted in the Jinma Bridge Project.