-
8,000-ton Large Block Slipway Project of CNOOC Platform Co., Ltd.Scale of construction:
One 8,000-ton large block slipway with a length of 139 m. -
Hydraulic Engineering Works of 300,000-DWT Floating Dock Project of COSCO (Dalian) Shipyard CO., Ltd.Scale of construction:
One 300,000-DWT floating dock, one 300,000-DWT ship-repairing berth, one breakwater in the east and one breakwater in the west. -
30,000-DWT Air Bag Shipway Works in Petroleum Equipment Industrial Zone of CNPCScale of construction:
Two 20,000-DWT shipyards with a launching mass of 10,000 tons. -
Land-based Backfilling Work of Hengli Petrochemical Project on Changxing Island, DalianScale of construction:
The total excavation and backfilling area is about 10,780,000 m2;
The backfill volume is 127,000,000 m3. -
Core Area Construction Work (Phase I) of Huayuankou Economic Zone, DalianScale of construction:
Land backfilling with an area of nearly 15 km2.
The overall length of revetment and cofferdam reaching approximately 28.4 km. -
Basin Dredging Works in Inner Bay of Hulushan Bay, Changxing IslandScale of construction:
The total dredging area of the south and north basins is 9,940,000 m2; the total dredging volume is 90,800,000 m3;
The total length of cofferdam in the south and north mud disposal areas is76,037 m; the total area of mud disposal areas is 21,700,000 m2. -
Basin Dredging Works in the North Port Area of Changxing IslandScale of construction:
The total dredging area of the inner and outer basins is 4,410,000 m2, and the total dredging volume is 18,170,000 m3. -
Infrastructure Construction Project on Petrochemical Base of Xizhong IslandScale of construction:
The total area is 7,210,000 m2 including a backfill area of 6,480,000 m2; the mountain-cutting area is 720,000 m2, the total backfill volume is 72,860,000 m3. -
North Public Water Culvert Project of Xizhong IslandScale of construction:
The total length of intake and open culvert is about 2,200 m including 150 m for the intake. -
Design of 900-ton Gantry Crane Rail Beam of STXScale of construction: The total length of the rail beam of 900-ton gantry crane is 1,744 m.
-
-
Temporary Works for the Emergency Treatment of Landfill Leachate Contamination in Xihai, JinzhouScale of construction:
Two 4,000-cube liquid storage tanks, one 14,000-cube storage pit for fly ash solids, the diaphragm wall with a length of 350 m, the diversion canal with a length of approximately 2,000 m, one 3,000-cube temporary storage tank during the construction period. -
Accident Buffer Pool of Dalian Petrochemical Co., Ltd. under CNPCScale of construction:
One 70,000-cubeaccident buffer pool, one lift pump station, the diversion canal with a length of approximately 210 m and appropriate supporting pipelines. -
Project evaluationNavigation Condition Impact Assessment of Subsea Tunnel Construction Project in Dalian Bay
Navigation Condition Impact Assessment of Subway Line 5 (Subsea Tunnel Project), Dalian
Navigation Condition Impact Assessment of Changxing Island-Jiaoliu Island Sea-Crossing Bridge Project -
Design reviewDry Dock Sub-project of Subsea Tunnel Construction Project in Dalian Bay
General Cargo Terminal Project of Taiping Bay Port Area of the Dalian Port
0# General Cargo Berth Project of the Public Port Area of Changxing Island
1# - 6# Berth Project in the East Zone of the Public Port Area of Changxing Island -
Terminal Project(Phase I) of Huanghua Integrated Port AreaScale of construction:
Container terminal: three 50,000-DWT container berths (hydraulic structure designed for 100,000-DWT ships) and supporting facilities. The handling capacity is 1600,000 TEU/a to accommodate the throughput of 1600,000 TEU/a. -
Container Logistics Transit Facilities of Grain Transshipment Project of Beiliang Co., Ltd. under CGLCScale of construction:
Two 50,000-DWT container berths and supporting facilities (used as general cargo berths at the preliminary stage) with the hydraulic structure designed for 100,000-DWT ships.
