-
5# and 6# Berths of Jinzhou PortScale of construction:
5# and 6# berths are 35,000-DWT general cargo berth and 50,000-DWT general cargo berth respectively. The design throughput of the terminal is 1,550,000 t/a.
The length of 5# berth is 262 m and that of 6# berth is 280 m, allowing for the extension of 7# berth. -
5,000-DWT and 10,000-DWT Berths of Zhuanghe PortScale of construction:
One 5,000-DWT berth and one 10,000-DWT berth, with the length of approach bank and sediment barrier reaching 2,100 m. -
Yantai-Dalian Railway Ferry ProjectScale of construction:
The maintenance terminal in the north port is 286 m long. The auxiliary ship terminal in the south port is 50 m long and 10 m wide. -
RO-RO Terminal Work of Port Reconstruction and Expansion Project of LIAOYU GroupTwo 10,000-GT ro-ro berths will be built and the capacity of two existing ro-ro berths will be increased from 3,000 tons and 5,000 tons to 5,000 tons and 10,000 tons respectively.
-
Passenger and RO-RO Terminal of East Port Area of Penglai, Yantai PortScale of construction:
Two 10,000-GT ro-ro berths and two 20,000-GT ro-ro berths, with an overall berth length of 930 m, an overall bank revetment length of 805 m and a land-based backfilling area of 143,000 m2. -
Hydraulic Engineering of Bulk Grain Transit Facilities of Grain Transshipment Project of Beiliang Co., Ltd. under CGLCScale of construction:
One 50,000-DWT specialized bulk grain berth (hydraulic structure designed for 100,000-DWT ships) with the length of the west bank revetment reaching 1,390 m and the length of breakwater reaching 176 m. -
Supporting 20,000-DWT Coal Terminal Project of Hengli Petrochemical (Dalian) Refinery Co., Ltd.Scale of construction:
One 20,000-DWT coal terminal (also able to handle 50,000-DWT ships) with a bank revetment length of 57.18 m. -
14# Berth of International Grain, Oil and Food Logistics Center Project of Beiliang Co., Ltd. under CGLCScale of construction:
One 50,000-DWT specialized bulk grain berth (hydraulic structure designed for 100,000-DWT ships). -
Container Logistics Transit Facilities of Grain Transshipment Project of Beiliang Co., Ltd. under CGLCScale of construction:
Two 50,000-DWT container berths and supporting facilities (used as general cargo berths at the preliminary stage) with the hydraulic structure designed for 100,000-DWT ships. -
Planning and Design of Dongtuo Central Fishery Port Project, in Lvshunkou District, DalianThe total land area of the port is 136,273 m2, including unloading shed, cold storage, trading market, parking lot, storage yard, comprehensive materials area, aquatic product processing area, administrative office area, catering, entertainment and living area, etc.
A new breakwater length of 570 m; 12 berths (including two new material berths and one reconstruction material berth) with the overall length of coastline reaching 655.7 m. -
Master Planning of the "13th Five-Year" Construction of the Key Fishery Port, DalianAccording to standards,15 central fishery ports (including 3 new ones) of Dalian are build and improved.
It is proposed to build terminals with length of 8.2km, a breakwater and wharf with length of 3.4km, a breakwater with length of 18.8km, a revetment with length of 11.1km,an approach bank with length of 1.7 km, to reinforce the original dam with length of 1.8 km, and to construct ancillary facilities including refrigeration plant, trading market, processing plant and law enforcement office b...... -
Planning and Design of Bachagou Fishery Port Project, in Changxing Island, DalianThe total land area of the planned port is 31,400 m2, including unloading shed, cold storage, product trading center, parking lot, comprehensive materials area, oil tank area, aquatic products processing area, administrative office, comprehensive law enforcement building, auxiliary building for life, etc.
Two 1000-DWT terminals with a total length of 166.6 m; Four fishery docks with a total length of 193.4 m; Three material wharfs with a total length of 180.7 m; The revetment with a length of 8...... -
Master Planning and Design of Jiangjunshi Central Fishery Port Project, in Wafangdian District, DalianThe total land area of the planned port is 94,120 m2, including unloading shed, cold storage, aquatic products trading center, parking lot, comprehensive materials area, oil tank area, aquatic products processing area, administrative office, comprehensive law enforcement building, catering and entertainment living area, etc.
Six fishery terminals with a total length of 210 m; A breakwater with a total length of 1313 m. -
Master Planning and Design of Pikou Central Fishery Port Project, in Pulandian District, DalianThe total area of port is 234,000 m2.
The land area of production facilities is 89,798 m2, including unloading shed, cold storage, aquatic products trading center, parking lot, comprehensive materials area, oil tank area, aquatic products processing area, administrative office area, comprehensive law enforcement building, catering and entertainment living area, etc. -
Marina Wall Project of Laohutan ParkScale of construction:
A total of 22 yacht berths with the terminal shoreline covering a length of approximately265.4 m. -
Marina Wall Project of Xiaoyao BayScale of construction:
The terminal shoreline covers a length of approximately 720 m. -
East & West Breakwaters and Temporary Cofferdam Works in the North Port Area of Changxing IslandScale of construction:
The breakwater is 8,570 m long and the cofferdam is 6,190 m long. -
West Breakwater Works in the Public Port Area, Hulushan Bay, Changxing Island, DalianScale of construction:
The west breakwater is 5,712 m long. -
Breakwater Works of COSCO (Dalian) Shipyard Co., Ltd.Scale of construction:
One 300,000-DWT fitting-out quay with the overall length of breakwaters and revetments reaching 2,130 m. -
Breakwater Project (Phase I & II) in the West Port Area of Yantai PortScale of construction:
The length of breakwaters reaches 2,782 m in the first phase and 6,218 m in the second phase.
