-
Proposal on Site Remediation and Infrastructure Construction of Dalian New Airport Coastal Business DistrictConstruction site: Northern part of the downtown (Dalian)
Construction scale: Approximately 140 square kilometers of planned land area
Total investment: RMB 159.747 billion
Construction contents: Site remediation of the Business District, with the construction of supporting highway, water/power/heating/gas supply, flood/water drainage, sewage, communication and sanitation facilities. -
Feasibility Study Report on the Comprehensive Transportation Hub Passenger Station at Dalian Bay Dalian City, Liaoning ProvinceConstruction scale: Planned land area 7.14 hectares, construction area 37,137 square meters
Total investment: RMB 383.1673 million
Main contents of the construction: Passenger station, main/auxiliary station squares, landscape planning matching the overall station layout, transportation roads within red lines and other supporting facilities. -
Power Network and Switching Station PPP Project of Dalian Changxing Island Economic ZoneDalian City, Liaoning Province
Operation mode: TOT (transfer-operate-transfer)
Operating method: Income + Viability Gap Funding
Amount of validated assets: RMB 687 million
Proposed contents of transfer and scale: Operation rights of the existing power network and switching stations within the Comprehensive Area of Changxing Island Economic Zone and the Industrial Zone.
Service contents: Preparation of the PPP project implementation plan (preliminary), value-for-money evaluation report and...... -
Dalian New Airport Cost Evaluation Project & Energy-saving Evaluation of Dalian Children's Hospital Renovation Project & Energy-saving Evaluation of Diamond Lidu Development Project in Dalian Puwan New AreaService contents: Evaluate whether the energy utilization of the project is scientific, accurate and reasonable. To clarify whether the project conforms to the national and local energy conservation requirements in terms of energy consumption, and provide relevant energy conservation indicators.
-
Overall Planning of Marine Space for the Start-up Area Construction of Dalian Airport New City - Social Stability Analysis & Social Stability and Risk Assessment Report on the Shantytown Renovation Project in Shabao Village of Dalian Changxing IslandService contents: Determine the risk type and level through prediction and analysis; formulate and clarify the natural conditions, specific measures and implementation requirements for risk prevention, and anticipate the controllable degree of risks to prevent and eliminate risks from the source; and prepare the analysis report to provide basis for the project decision-making.
-
Whole-process Consulting Services for the Closed Management of Northern Part of Dalian Changxing Island Petrochemical BaseProject location: Dalian Changxing Island Economic Zone
Construction scale: 17 hectares of planned area and 7,000m enclosed fences
Service contents: Provide the whole-process engineering consulting services for scheme planning of the parking lot available for dangerous-goods transport vehicles and the closed management center, as well as the preparation of layout plan, project proposal, feasibility study report, safety impact assessment report, environmental impact assessment, energy-saving ev...... -
Integrated planning (e.g. constructive detailed planning, safety planning, environmental protection planning, fire protection planning) and whole-process consulting services for Panjin Northern Asphalt Co., Ltd.Panjin City, Liaoning Province
Construction scale: 62 hectares
Main contents of the planning: Conduct the summarized analysis of planning results concerning land use , security, environmental protection and fire protection of the plant area, provide the whole-process consulting services and formulate the constructive detailed planning. -
Integrated planning (e.g. space upgrading and land use planning, industrial planning, safety planning, environmental protection planning, fire protection planning) and whole-process consulting services for Chemical New Material Industrial Park of Jiangsu Zhenjiang New District (one of the top 20 chemical industrial parks)Zhenjiang City, Jiangsu Province
Construction scale: 12.79 square kilometers
Main contents of the planning: Integrated the industrial planning and comprehensive consideration of security, environmental protection, fire protection and other professional requirements, conduct the administration and overall planning of park spatial layout and land use; Determine the guidelines for park landscape administration combined with the concepts of sponge city and ecological restoration/urban renovation, ...... -
Integrated planning (e.g. regulatory detailed planning, industrial planning, safety planning, environmental protection planning, fire protection planning) and whole-process consulting services for Panjin Hi-tech Industrial Development Zone (National High-tech Zone)Panjin City, Liaoning Province
Construction scale: 44.48 square kilometers
Main contents of the planning: Prepare the general planning, regulatory detailed planning, comprehensive planning and special planning of security, environmental protection and fire protection for the development zone, as well as provide the whole-process, all-round and one-stop professional consulting services for the development zone management committee and stationed enterprises. -
Integrated planning (e.g. overall planning, industrial planning, safety planning, environmental protection planning, fire protection planning) and whole-process consulting services for Dalian Changxing Island (Xizhong Island) Petrochemical Industrial Park (one of the seven national petrochemical bases)Dalian City, Liaoning Province
Construction scale: 110 square kilometers
Main contents of the planning: Based on the strategic adjustment of petrochemical industrial structure and promotion of new petrochemical growth in Dalian City, prepare the industrial planning, general planning, regulatory detailed planning, port planning, land use planning and special planning of security, environmental protection and fire protection.
