North Public Water Culvert Project of Xizhong IslandScale of construction:
The total length of intake and open culvert is about 2,200 m including 150 m for the intake. -
Design of 900-ton Gantry Crane Rail Beam of STXScale of construction: The total length of the rail beam of 900-ton gantry crane is 1,744 m.
-
-
Temporary Works for the Emergency Treatment of Landfill Leachate Contamination in Xihai, JinzhouScale of construction:
Two 4,000-cube liquid storage tanks, one 14,000-cube storage pit for fly ash solids, the diaphragm wall with a length of 350 m, the diversion canal with a length of approximately 2,000 m, one 3,000-cube temporary storage tank during the construction period. -
Accident Buffer Pool of Dalian Petrochemical Co., Ltd. under CNPCScale of construction:
One 70,000-cubeaccident buffer pool, one lift pump station, the diversion canal with a length of approximately 210 m and appropriate supporting pipelines.