Special Planning of Roads Engineering in Tongliao CityTongliao City, Inner Mongolia
2016
The scope of planning is the downtown area of Tongliao City. By the end of planning period (2030), the land area of downtown construction will reach 164 Km2, with the permanent resident population of 1.1 million.
The project planning covers all road networks within the downtown area, including the structural layout, plane/vertical/cross-section design and the intersection design of more than 270 roads. -
Backfilling of Changxing Island Sino Life MTO Project SiteLocated in the north of Xizhong Island Petrochemical Industrial Park, the backfilling of Changxing Island Sino Life MTO Project Site covers the marine space and rear hilly/mountainous areas between south breakwater and northern/southern temporary cofferdams to the west of CNPC construction site. With a total investment of RMB 2.89 billion, the project involves the following works, i.e. excavation volume 66.59 million cubic meters, backfill volume 69.66 million cubic meters, leveling area 5.3 mil......
-
Subgrade Excavation and Spoil Engineering Design for Longwang-Beishan Section of Bohai AvenueDalian City, Liaoning Province
August 2017
As a key project of Dalian City, the construction will make the north-south Golden Coast Section of Bohai Avenue available for transportation and provide an opportunity for the rapid development of Golden Coast Park.
This site remediation project involves a distance of about 2 km, the bottom width of mountain excavation reach 140m and the corresponding bottom and slope areas are 347,000 m2 and 290,000 m2 respectively, with the earthwork volume of 20...... -
Site Remediation in the Northern Part of Xizhong Island (Phase I & II)With a total investment of RMB 708 million, the Site Remediation in the Northern Part of Xizhong Island (Phase I & II) involves the following works, i.e. excavation volume 18.54 million cubic meters, backfill volume 22.27 million cubic meters, leveling area 8.66 million square meters, slope area 0.24 million square meters, construction of new temporary embankment 1,987m.
-
Silt Area Foundation Treatment of Hengli Project (Phase II)Dalian City, Liaoning Province
August 2014
The two silt blocks (about 180,000 square meters) formed during the plant site backfill of Hengli Petrochemical Project (Phase II) have caused severe impacts on the project construction and production. The corresponding foundation treatment has saved investments for the government and enterprise, and satisfied the demands for plant construction as well.
This project adopts the modified vacuum preloading method for soft foundation treatment. The silt......