300,000-DWT Crude Oil Terminal Project of Changxing IslandScale of construction:
One 300,000-DWT crude oil terminal and one trestle bridge with a handling capacity of 18,600,000 t/a. -
300,000-DWT Crude Oil Terminal Project of Rongxing Port Area of Panjin PortScale of construction:
One 300,000-DWT crude oil terminal and one trestle bridge with a handling capacity of 17,800,000 t/a. -
Supporting Terminal Work (114# - 115# 300,000-DWT Crude Oil Berths in the North Shore Work Area of Changxing Island) of 20,000,000-t/a Integrated Refinery Project of Hengli Petrochemical (Dalian) Refinery Co., Ltd.Scale of construction:
Two 300,000-DWT crude oil terminals (also able to handle100,000-DWT oil carriers) with a handling capacity of 32,000,000 t/a. -
50,000-DWT Refined Oil Terminal Project of Dalian Petrochemical Co., Ltd. under CNPCScale of construction:
One 50,000-DWT refined oil berth and one 10,000-DWT refined oil berth (also able to handle 30,000-DWT ships)with a handling capacity of 6,810,000 t/a. -
303# Liquid Chemical Berth Project of the West Work Zone of Rongxing Port Area of Panjin PortScale of construction:
One 50,000-DWT liquid chemical berth with a handling capacity of 1,865,000t/a. -
Supporting Terminal Work (108# - 113# Berths in the North Shore Work Zone of Changxing Island) of 20,000,000-t/a Integrated Refinery Project of Hengli Petrochemical (Dalian) Refinery Co., Ltd.Scale of construction:
6 new liquid bulk berths: one 5,000-DWT refined oil and LPG berth, one 10,000-DWT refined oil and liquid chemical berth, one 20,000-DWT refined oil and LPG berth, one 20,000-DWT refined oil and liquid chemical berth, one 30,000-DWT refined oil and liquid chemical berth and one 50,000-DWT refined oil berth, with a handling capacity of 11,510,000 t/a, a shoreline length of 1,261 m and a bank revetment length of 1,641 m. -
100,000-DWT Crude Oil Terminal Project of Changxing Island, DalianScale of construction:
One 100,000-DWT crude oil terminal (also able to handle 10,000-DWT oil carriers and hydraulic structure designed for 150,000-DWT ships) with a handling capacity of 4,750,000 t/a. -
10#, 15# and 16# Berths of Reconstruction and Expansion Project of Dalian New PortScale of construction: Two 10,000-DWT refined oil berth and one 50,000-DWT refined oil berth.
-
Supporting Petrochemical Terminal Project of Hengli Petrochemical (Dalian) Refinery Co., Ltd.Scale of construction:
Two 100,000-DWT petrochemical berths and one 5,000-DWT petrochemical berth. -
7#-10# Refined oil Berth Project of Beiliang Co., Ltd. under CGLCScale of construction:
Two 20,000-DWT oil berths (hydraulic structure designed for 30,000-DWT ships) and two 50,000-DWT oil berths with a handling capacity of 6,740,000 t/a. -
Oil Storage and Supply Base Project (Hydraulic Engineering) of CHIMBUSCOScale of construction:
Two oil product handling berths (one 2,000-DWT berth and one 10,000-DWT berth);
Six anchoring berths (one 2,000-DWT berth, two 1,000-DWT berths and three 600-DWT berths).
The berth length is 870.3 m and the bank revetment length is 543 m. -
331# and 332# Liquid Chemical Berth Project of the West Work Zone of Rongxing Port Area, Panjin PortScale of construction:
One 10,000-DWT liquid chemical berth and one 50,000-DWT liquid chemical berth with a handling capacity of 1,960,000 t/a. -
Supporting Liquid Bulk Terminal Work of Terephthalic Acid Project of Yisheng (Dalian) Petrochemical Co., Ltd.Scale of construction:
One 5,000-DWT liquid chemical terminal (also able to handle 10,000-DWT ships) will be built in the first phase; two 5,000-DWT liquid chemical berths (able to handle a 20,000-DWT ship) will be built in the second phase.
The total handling capacity of liquid chemical berths built in the first and second phases is 2,310,000 t/a.