Supporting General Cargo Terminal Project of Hengli Petrochemical (Dalian) Refinery Co., Ltd.Scale of construction:
Three 50,000-DWT general cargo berths (also able to handle 1,000-DWT ships) with a throughput of 4,000,000 t/a. -
Supporting 10,000-DWT Terminal Work (Phase I & II) of International Aquatic Product Trading Center of DalianScale of construction:
One 3,000-DWT terminal and one extended 10,000-DWT terminal with a handling capacity of 250,000 t/a. -
Supporting General Cargo Terminal Work of Terephthalic Acid Project of Yisheng (Dalian) Petrochemical Co., Ltd.Scale of construction:
One 5,000-DWT (able to handle unloaded 10,000-DWT ships) general cargo terminal, one 2,000-DWT general cargo terminal and one 3,000-DWT (able to handle a 10,000-DWT ship) general cargo terminal.
The handling capacity will reach 2,000,000 t/a after the structure reinforcement of the general cargo berths and terminals. -
Hydraulic Engineering Works of International Grain, Oil and Food Logistics Center Project of Beiliang Co., Ltd. under CGLCScale of construction:
One 50,000-DWT general cargo berth (elementary function), two 10,000-DWT general cargo berth (elementary function) and supporting facilities. -
5# and 6# Berths of Jinzhou PortScale of construction:
5# and 6# berths are 35,000-DWT general cargo berth and 50,000-DWT general cargo berth respectively. The design throughput of the terminal is 1,550,000 t/a.
The length of 5# berth is 262 m and that of 6# berth is 280 m, allowing for the extension of 7# berth. -
5,000-DWT and 10,000-DWT Berths of Zhuanghe PortScale of construction:
One 5,000-DWT berth and one 10,000-DWT berth, with the length of approach bank and sediment barrier reaching 2,100 m.