Feasibility Study on the Algeria Central Port ProjectScale of construction:
21 container berths, bulk and general cargo berths and auxiliary ship berths, and their related land supporting facilities; the total length of the terminal: 6,350 m; the length of breakwater: 2,395 m; the length of bank revetment: 4,748 m; the occupied area: 6,800,000 m2; the annual throughput: 6,300,000 TEU for containers, 25,700,000 tons for bulk and general cargo. -
Proposed New Port Development ( Phase I ) in Manus Province, Papua New GuineaScale of construction
Four 2,000-DWT fishing vessel berths, one 20,000-DWT multi-purpose berth and one 3,000-DWT oil product berth are proposed and supporting facilities. The total area of construction land (Phase I) is 212,000 m2.
The total throughput of berths is 60,000t/a for fish discharging, 4,233TEU/a for containers, 60,000t/a for bulk cargoes and 200,000t/a for refined oil products. -
Proposal for the New Airport Coastal Business District Land Consolidation and Infrastructure Construction Project of DalianScale of construction:
The total area of construction land is 12.8 km2, including 5.4 km2 for reclamation and 7.3 km2 for land consolidation. The total length of permanent landscape revetment is 15.61 km and the volume of backfill is approximately 53,060,000 m3. The traffic network covers 83 km. In addition to the utility tunnel with a length of 6.51 km, the pipe network for water supply, power supply, heat supply, gas supply, drainage, sewage and communication will also be built. -
Feasibility Study on the Supporting Terminal of Changxing Island Refinery ProjectScale of construction:
11 refined oil and liquid chemical berths, including:
two 50,000-DWT refined oil berths (hydraulic structure designed for 100,000-DWT ships);
two 30,000-DWT refined oil and chemical berths (hydraulic structure designed for 50,000-DWT ships on 3# berth);
six 10,000-DWT refined oil and chemical berths;
one 5,000-DWT LPG and chemical berth. -
Feasibility Study on the Preliminary Project of Fengnan Port Area of Tangshan PortScale of construction:
The project mainly includes breakwater, bank revetment, terminal and channel engineering.
The total length of breakwater and bank revetment is 22 km.
The project includes four 20,000-DWT general cargo berths with the overall length of terminal reaching 764 m.
A 20,000-DWT one-way channel is planned with a length of approximately 21 km, a width of 135.0 m and a bottom elevation of -9.6 m. -
Feasibility Study on Changxing Island Shipbuilding Base of Longxiang Songliao (Dalian) Yacht Co., Ltd.Scale of construction:
One 10,000-DWT outfitting berth with a length of 255 m will be built. The shoreline of yacht dock is 371 m long. One 10,000-DWT slipway (gasbag slipway) with a length of 45 m will be built. The total area of the rear plant is 100,000 m2. One fiberglass boat workshop, one steel ship workshop and several office buildings, complex buildings and yacht dry dock stocks will cover an area of 43,000 m2. -
Public Channel Project of Petrochemical Industry Base of the Outer Hulushan Bay, Changxing Island, DalianScale of construction:
The total length of channel is 9.1 km. The outer section and mid-section of the waterway can accommodate the one-way navigation of loaded 100,000-DWT oil carriers and 300,000-DWT oil carriers (ship-repairing), and the two-way navigation of 50,000-DWT ships; the inner section can accommodate the one-way navigation of 300,000-DWT oil carriers (repairing ships) and the two-way navigation of 50,000-DWT ships. -
Feasibility Study on the Terminal Project of Huanghua Integrated Port AreaScale of construction:
Container terminal: three 50,000-DWT container berths (hydraulic structure designed for 100,000-DWT ships), the total berth length: 999 m.
Ro-Ro terminal: one 50,000-GT ro-ro berth and one 70,000-GT ro-ro berth, the total berth length: 747 m.
General cargo terminal: two 100,000 general cargo berths, the total berth length: 559 m. -
Cruise Terminal Project of Shuicheng Tourist Area of Jinbo Bay, PanjinScale of construction:
One 100,000-GT cruise berth (hydraulic structure designed for 150,000-GT ships) and a supporting passenger transportation center with a construction area of 17,500 m2 will be built. The berth is 419 m long with an annual capacity of 200,000 people. The approach channel is 6,340 m long and can accommodate the around-the-clock one-way navigation of 100,000-GT cruises. The total length of breakwater is 1,831 m. -
Planning and Argumentation on the Use of Sea Areas in Jinbo Coast Modern Service Industry Zone (in cooperation with National Marine Environmental Monitoring Center)Scale of construction:
The sea area for planning and argumentation is about 21.9 km2.
The construction area is about 19.1 km2. -
Argumentation on the Use of Sea Areas Project (Phase I) of Taiping Bay Port Area of the Dalian Port (in cooperation with National Marine Environmental Monitoring Center)Scale of construction:
According to the plan for the use of sea areas in the first phase, 8 general and bulk cargo berths will be built with the length of terminal shoreline reaching 2.25 km. The total area of the port is 11.8 km2. The sea area for land use (reclamation) is 4.8 km2. The sea area for basin and channel use is about 4.2 km2. -
Feasibility Study on the Supporting Terminal Work of Fine Chemicals and Raw Materials Project of NORINCO GroupScale of construction:
A 20,000-DWT general cargo berth is planned to be built (to simultaneously accommodate two 5,000-DWT general cargo ships; the hydraulic structure is designed to accommodate a 50,000-DWT bulk cargo ship and transport overweight and oversize cargos).
Three 10,000-DWT chemical berths, one 30,000-DWT refined oil and chemical berth, one 50,000-DWT refined oil and chemical berth (to simultaneously accommodate two 5,000-DWT oil product carriers) and one 100,000-DWT refined oil ...... -
Study on the Oil Pipeline Planning Scheme and the Crude Oil Inbound Transportation Plan for Petrochemical Enterprises in PanjinScale of construction:
Crude oil, refined oil and liquid chemicals will be supplied to major counties and districts including Panshan County, Shuangtaizi District, Xinglongtai District and Dawa District.
11 oil pipelines will be buried with a length of 91 km.