Yantai-Dalian Railway Ferry Project


Scale of construction:
The maintenance terminal in the north port is 286 m long. The auxiliary ship terminal in the south port is 50 m long and 10 m wide.


Scale of construction:
The maintenance terminal in the north port is 286 m long. The auxiliary ship terminal in the south port is 50 m long and 10 m wide.