7#-10# Refined oil Berth Project of Beiliang Co., Ltd. under CGLC


Scale of construction:
Two 20,000-DWT oil berths (hydraulic structure designed for 30,000-DWT ships) and two 50,000-DWT oil berths with a handling capacity of 6,740,000 t/a.


Scale of construction:
Two 20,000-DWT oil berths (hydraulic structure designed for 30,000-DWT ships) and two 50,000-DWT oil berths with a handling capacity of 6,740,000 t/a.