Argumentation on the Use of Sea Areas Project (Phase I) of Taiping Bay Port Area of the Dalian Port (in cooperation with National Marine Environmental Monitoring Center)

Scale of construction:
According to the plan for the use of sea areas in the first phase, 8 general and bulk cargo berths will be built with the length of terminal shoreline reaching 2.25 km. The total area of the port is 11.8 km2. The sea area for land use (reclamation) is 4.8 km2. The sea area for basin and channel use is about 4.2 km2.
