Feasibility Study on the Preliminary Project of Fengnan Port Area of Tangshan Port

14 唐山港丰南港区起步工程可研.jpg

Scale of construction:

The project mainly includes breakwater, bank revetment, terminal and channel engineering.

The total length of breakwater and bank revetment is 22 km.

The project includes four 20,000-DWT general cargo berths with the overall length of terminal reaching 764 m.

A 20,000-DWT one-way channel is planned with a length of approximately 21 km, a width of 135.0 m and a bottom elevation of -9.6 m.