Feasibility Study on the Supporting Terminal of Changxing Island Refinery Project


Scale of construction:
11 refined oil and liquid chemical berths, including:
two 50,000-DWT refined oil berths (hydraulic structure designed for 100,000-DWT ships);
two 30,000-DWT refined oil and chemical berths (hydraulic structure designed for 50,000-DWT ships on 3# berth);
six 10,000-DWT refined oil and chemical berths;
one 5,000-DWT LPG and chemical berth.
