中文  |  EN

Feasibility Study on the Supporting Terminal of Changxing Island Refinery Project

Scale of construction:

11 refined oil and liquid chemical berths, including:

two 50,000-DWT refined oil berths (hydraulic structure designed for 100,000-DWT ships);

two 30,000-DWT refined oil and chemical berths (hydraulic structure designed for 50,000-DWT ships on 3# berth);

six 10,000-DWT refined oil and chemical berths;

one 5,000-DWT LPG and chemical berth.