Master Planning of Dengshahe Port

The port area has a planned land area of 10.71 km2 and a total shoreline length of 4.65 km. It is planned that twenty-one 3,000- to 10,000-DWT general cargo berths will be provided with the estimated throughput reaching 3,200,000 tons and 6,500,000 tons in 2015 and 2020 respectively.
