中文  |  EN

Detailed Regulatory Planning of the Ship and Equipment Manufacturing Area of Changxing Island Harbor Industrial Zone, Dalian

06 长兴岛临港工业区船舶及装备制造区控制性详细规划.jpg

The area is planned to cover an area of 17.5 km2 on land,13.7 km2 on waters, a terminal shoreline of 19.83 km length, a total dredging volume of 96,910,000 m3 and a reclamation area of 28.6 km2.