中文  |  EN

Container Logistics Transit Facilities of Grain Transshipment Project of Beiliang Co., Ltd. under CGLC

中国华粮物流集团北良有限公司东部港区码头作业区陆域基础及配套设施方案设计.jpg

Scale of construction:

Two 50,000-DWT container berths and supporting facilities (used as general cargo berths at the preliminary stage) with the hydraulic structure designed for 100,000-DWT ships.