中文  |  EN

Terminal Project(Phase I) of Huanghua Integrated Port Area

黄骅港综合港区集装箱码头一期工程.jpg

Scale of construction:

Container terminal: three 50,000-DWT container berths (hydraulic structure designed for 100,000-DWT ships) and supporting facilities. The handling capacity is 1600,000 TEU/a to accommodate the throughput of 1600,000 TEU/a.