Comprehensive Governance of Traffic Bridge Under the Dam at Fengman Hydropower Station



Jilin City, Jilin Province
November 2012~May 2014
The project construction guarantees the safe/reliable operation of hydropower station and the life/property safety of downstream people.
The bridge is 432.2m long with the deck width of 20m, and the span arrangement is as follows: 59.2m+3x100m+59.2m=418.4m. The bridge consists of variable-section continuous box girders made of prestressed concrete, with a total investment of RMB 60.2 million.