The project is located at Tongliao Vocational College (crossing the Huolingol Road), which effectively eliminates the safety hazards for the teachers and students crossing the trunk road (Huolingol Road) between the East and West campuses after completion. 

The construction of main bridge adopts the steel truss girders to support the footwalks. Parameters of the main girder are as follows: height 4.0m, width 6.0m, length 41.0m, span 39.0m; the cross beams are arranged at a spacing of 3.9m; and the stairway is composed of steel beams and concrete platforms, with 4 entrances/exits arranged on each side of Huolingol Road, including two sets of entrances/exits leading to the campus (with gates) and space outside the fences respectively.    

The project was completed in 2017.