Rizhao-Yizheng Crude Oil Pipeline and Supporting Approach Project


Located on the north side of Laoshan Port, the project site is adjacent to the existing Tonghai Terminal. The respective construction of two new 0.3Mt crude oil terminals will be completed in Phase I & II. The superstructure design of approach bridge undertaken by the Institute has been completed in September 2006. Based on the classification criteria, the approach with 6 spans (single span-length 125m) is classified as a large bridge (length 788.3m), the safety level of structural design is Level-II and the estimated construction cost is about RMB 82 million.