Temporary Works for the Emergency Treatment of Landfill Leachate Contamination in Xihai, Jinzhou

Scale of construction:
Two 4,000-cube liquid storage tanks, one 14,000-cube storage pit for fly ash solids, the diaphragm wall with a length of 350 m, the diversion canal with a length of approximately 2,000 m, one 3,000-cube temporary storage tank during the construction period.