中文  |  EN

Infrastructure Construction Project on Petrochemical Base of Xizhong Island

Scale of construction:

The total area is 7,210,000 m2 including a backfill area of 6,480,000 m2; the mountain-cutting area is 720,000 m2, the total backfill volume is 72,860,000 m3.