Basin Dredging Works in the North Port Area of Changxing Island


Scale of construction:
The total dredging area of the inner and outer basins is 4,410,000 m2, and the total dredging volume is 18,170,000 m3.


Scale of construction:
The total dredging area of the inner and outer basins is 4,410,000 m2, and the total dredging volume is 18,170,000 m3.