Ship-building Base Project of Dayang (Dalian) Ship Engineering Co., Ltd.


Scale of construction:

One 150,000-DWT drydock, one 100,000-DWT drydock, two 150,000-DWT ship-repairing quays, two 100,000-DWT ship-repairing quays and one auxiliary ship berth will be built. The shoreline is 1,415 m long.

Other structures including production and supporting facilities will also be built. The total area is 69,859 m2 and the plant will cover an area of 53.83 ha.