中文  |  EN

Coast Reconstruction Project of Xinghai Bay, Dalian

Scale of construction:

A reclamation area of 10,00,000 m2; 3 tourist berths with a length of 415 m; 3 artificial bathing beach areas with a shoreline length of 1,400 m and a width of 80 m; the breakwater with a length of 1,000 m; the east and west revetment of Malan River with a length of 2,000 m .