Public Channel Project in the Inner Hulushan Bay of Changxing Island

Scale of construction:
The overall length of channel will reach 14.9 km to accommodate the one-way tide-level navigation of 300,000-DWT oil repairing-ship and 10,000-TEU container ships and large offshore platforms (towing navigation).
