Argumentation on the Use of Sea Areas Project (Phase I) of Taiping Bay Port Area of the Dalian Port (in cooperation with National Marine Environmental Monitoring Center)Scale of construction:
According to the plan for the use of sea areas in the first phase, 8 general and bulk cargo berths will be built with the length of terminal shoreline reaching 2.25 km. The total area of the port is 11.8 km2. The sea area for land use (reclamation) is 4.8 km2. The sea area for basin and channel use is about 4.2 km2. -
Feasibility Study on the Supporting Terminal Work of Fine Chemicals and Raw Materials Project of NORINCO GroupScale of construction:
A 20,000-DWT general cargo berth is planned to be built (to simultaneously accommodate two 5,000-DWT general cargo ships; the hydraulic structure is designed to accommodate a 50,000-DWT bulk cargo ship and transport overweight and oversize cargos).
Three 10,000-DWT chemical berths, one 30,000-DWT refined oil and chemical berth, one 50,000-DWT refined oil and chemical berth (to simultaneously accommodate two 5,000-DWT oil product carriers) and one 100,000-DWT refined oil ...... -
Study on the Oil Pipeline Planning Scheme and the Crude Oil Inbound Transportation Plan for Petrochemical Enterprises in PanjinScale of construction:
Crude oil, refined oil and liquid chemicals will be supplied to major counties and districts including Panshan County, Shuangtaizi District, Xinglongtai District and Dawa District.
11 oil pipelines will be buried with a length of 91 km. -
300,000-DWT Crude Oil Terminal Project of Changxing IslandScale of construction:
One 300,000-DWT crude oil terminal and one trestle bridge with a handling capacity of 18,600,000 t/a. -
300,000-DWT Crude Oil Terminal Project of Rongxing Port Area of Panjin PortScale of construction:
One 300,000-DWT crude oil terminal and one trestle bridge with a handling capacity of 17,800,000 t/a. -
Supporting Terminal Work (114# - 115# 300,000-DWT Crude Oil Berths in the North Shore Work Area of Changxing Island) of 20,000,000-t/a Integrated Refinery Project of Hengli Petrochemical (Dalian) Refinery Co., Ltd.Scale of construction:
Two 300,000-DWT crude oil terminals (also able to handle100,000-DWT oil carriers) with a handling capacity of 32,000,000 t/a. -
50,000-DWT Refined Oil Terminal Project of Dalian Petrochemical Co., Ltd. under CNPCScale of construction:
One 50,000-DWT refined oil berth and one 10,000-DWT refined oil berth (also able to handle 30,000-DWT ships)with a handling capacity of 6,810,000 t/a. -
303# Liquid Chemical Berth Project of the West Work Zone of Rongxing Port Area of Panjin PortScale of construction:
One 50,000-DWT liquid chemical berth with a handling capacity of 1,865,000t/a. -
Supporting Terminal Work (108# - 113# Berths in the North Shore Work Zone of Changxing Island) of 20,000,000-t/a Integrated Refinery Project of Hengli Petrochemical (Dalian) Refinery Co., Ltd.Scale of construction:
6 new liquid bulk berths: one 5,000-DWT refined oil and LPG berth, one 10,000-DWT refined oil and liquid chemical berth, one 20,000-DWT refined oil and LPG berth, one 20,000-DWT refined oil and liquid chemical berth, one 30,000-DWT refined oil and liquid chemical berth and one 50,000-DWT refined oil berth, with a handling capacity of 11,510,000 t/a, a shoreline length of 1,261 m and a bank revetment length of 1,641 m. -
100,000-DWT Crude Oil Terminal Project of Changxing Island, DalianScale of construction:
One 100,000-DWT crude oil terminal (also able to handle 10,000-DWT oil carriers and hydraulic structure designed for 150,000-DWT ships) with a handling capacity of 4,750,000 t/a. -
10#, 15# and 16# Berths of Reconstruction and Expansion Project of Dalian New PortScale of construction: Two 10,000-DWT refined oil berth and one 50,000-DWT refined oil berth.
-
Supporting Petrochemical Terminal Project of Hengli Petrochemical (Dalian) Refinery Co., Ltd.Scale of construction:
Two 100,000-DWT petrochemical berths and one 5,000-DWT petrochemical berth. -
7#-10# Refined oil Berth Project of Beiliang Co., Ltd. under CGLCScale of construction:
Two 20,000-DWT oil berths (hydraulic structure designed for 30,000-DWT ships) and two 50,000-DWT oil berths with a handling capacity of 6,740,000 t/a. -
Oil Storage and Supply Base Project (Hydraulic Engineering) of CHIMBUSCOScale of construction:
Two oil product handling berths (one 2,000-DWT berth and one 10,000-DWT berth);
Six anchoring berths (one 2,000-DWT berth, two 1,000-DWT berths and three 600-DWT berths).
The berth length is 870.3 m and the bank revetment length is 543 m. -
331# and 332# Liquid Chemical Berth Project of the West Work Zone of Rongxing Port Area, Panjin PortScale of construction:
One 10,000-DWT liquid chemical berth and one 50,000-DWT liquid chemical berth with a handling capacity of 1,960,000 t/a. -
Supporting Liquid Bulk Terminal Work of Terephthalic Acid Project of Yisheng (Dalian) Petrochemical Co., Ltd.Scale of construction:
One 5,000-DWT liquid chemical terminal (also able to handle 10,000-DWT ships) will be built in the first phase; two 5,000-DWT liquid chemical berths (able to handle a 20,000-DWT ship) will be built in the second phase.
The total handling capacity of liquid chemical berths built in the first and second phases is 2,310,000 t/a. -
Supporting General Cargo Terminal Project of Hengli Petrochemical (Dalian) Refinery Co., Ltd.Scale of construction:
Three 50,000-DWT general cargo berths (also able to handle 1,000-DWT ships) with a throughput of 4,000,000 t/a. -
Supporting 10,000-DWT Terminal Work (Phase I & II) of International Aquatic Product Trading Center of DalianScale of construction:
One 3,000-DWT terminal and one extended 10,000-DWT terminal with a handling capacity of 250,000 t/a. -
Supporting General Cargo Terminal Work of Terephthalic Acid Project of Yisheng (Dalian) Petrochemical Co., Ltd.Scale of construction:
One 5,000-DWT (able to handle unloaded 10,000-DWT ships) general cargo terminal, one 2,000-DWT general cargo terminal and one 3,000-DWT (able to handle a 10,000-DWT ship) general cargo terminal.
The handling capacity will reach 2,000,000 t/a after the structure reinforcement of the general cargo berths and terminals. -
Hydraulic Engineering Works of International Grain, Oil and Food Logistics Center Project of Beiliang Co., Ltd. under CGLCScale of construction:
One 50,000-DWT general cargo berth (elementary function), two 10,000-DWT general cargo berth (elementary function) and supporting facilities.